1 Introduction
2 Key conclusions
3 The present and the future of the upstream segment in Russia
3.1. Production of oil and gas condensate in Russia, by companies, 2005-2014
3.2. Production of oil and gas condensate in Russia, by producing regions, 2005-2014
3.3. Estimate of annual oil production in Russia for 2015-2020
3.4. Key prospective production projects, by companies
3.5. Impact of sanctions on implementation of onshore production projects, including transport infrastructure
3.5.1. List of technologies and equipment sanctions apply to
3.5.2. Impact of sanctions on performance of offshore projects and projects for development of the Bazhenov Formation
3.5.3. Estimate of additional onshore hydrocarbon production rates required to make up for probable shortfall of offshore production
3.5.4. Evaluation of production processes for hydrocarbon output subject to shortfall at the onshore fields
3.6. Estimation techniques for equipment, production facilities and transport infrastructure facilities for development of oil and gas bearing onshore fields
4 General estimation of piping for oil non-trunk pipelines in 2015-2020
5 General estimation of piping for gas non-trunk pipelines in 2015-2020
6 Valuation of construction investments for oil and gas non-trunk pipelines in 2015-2020
7 General estimation analysis of oil processing units, oil pumping stations and pumps for oil production facilities in 2015-2020
8 General estimation analysis of gas processing units, booster compressor stations and gas compressor units for gas production facilities in 2015-2020
9 Projects for construction of supply pipelines in the Khanty-Mansiysk Autonomous District
9.1. Geographical, environmental and climatic conditions in the Khanty-Mansiysk Autonomous District
9.2. Profiles of development projects for new major oil fields (peak production exceeding 1 million tons per year) in 2015-2020 in the Khanty-Mansiysk Autonomous District
9.3. Profiles of development projects for new medium size oil fields (peak production exceeding 0.5 -1 million tons per year) in 2015-2020 in the Khanty-Mansiysk Autonomous District and southern Tyumen Region
10 Projects for construction of supply pipelines in the Yamal-Nenets Autonomous District
10.1. Geographical, environmental and climatic conditions in the Yamal-Nenets Autonomous District, including the Yamal Peninsula
10.2. Profiles of development projects for new major oil fields (peak production exceeding 1 million tons per year) in 2015-2020 in the Yamal-Nenets Autonomous District
10.3. Profiles of development projects for new medium size oil fields (peak production exceeding 0.5 -1 million tons per year) in 2015-2020 in the Yamal-Nenets Autonomous District
10.4. Projects for construction of gas non-trunk pipelines in the Yamal-Nenets Autonomous District
10.5. Profiles of development projects for new major oil fields (peak production exceeding 1 million tons per year) in 2015-2020 in the Yamal Peninsula
10.6. Profiles of development projects for new medium size oil fields (peak production exceeding 0.5 -1 million tons per year) in 2015-2020 in the Yamal Peninsula
10.7. Projects for construction of gas non-trunk pipelines in the Yamal Peninsula
11 Projects for construction of supply pipelines in Volga-Urals
11.1. Geographical, environmental and climatic conditions in Volga-Urals
11.2. Profiles of development projects for new major oil fields (peak production exceeding 1 million tons per year) in 2015-2020 in Volga-Urals
11.3. Profiles of development projects for new medium size oil fields (peak production exceeding 0.5 -1 million tons per year) in 2015-2020 in Volga-Urals
11.4. Projects for construction of gas non-trunk pipelines in Volga-Urals
12 Projects for construction of supply pipelines in the Timan-Pechora oil-and-gas province
12.1. Geographical, environmental and climatic conditions in the Timan-Pechora oil-and-gas province
12.2. Profiles of development projects for new major oil fields (peak production exceeding 1 million tons per year) in 2015-2020 in the Timan-Pechora oil-and-gas province
12.3. Profiles of development projects for new medium size oil fields (peak production exceeding 0.5 -1 million tons per year) in 2015-2020 in the Timan-Pechora oil-and-gas province
13 Projects for construction of supply pipelines in Eastern Siberia and Yakutia
13.1. Geographical, environmental and climatic conditions in Eastern Siberia and Yakutia
13.2. Profiles of development projects for new major oil fields (peak production exceeding 1 million tons per year) in 2015-2020 in Eastern Siberia
13.3. Profiles of development projects for new medium size oil fields (peak production exceeding 0.5 -1 million tons per year) in 2015-2020 in Eastern Siberia
13.4. Projects for construction of gas non-trunk pipelines in Eastern Siberia
14 Profiles of development projects for new major oil fields (peak production exceeding 1 million tons per year) in 2013-2020 in the Russian shelf area
15 Projects for construction of gas non-trunk pipelines in the Russian shelf area
16 Integral estimation of projects of new small size oil fields (peak production less than 0.5 million tons per year) in 2015-2020
16.1. Overall estimation of pipelines needed (overall diameter-based length)
16.2. General estimation of process facilities needed (oil processing units, oil pumping stations)
17 Profiles of manufacturers of equipment for non-trunk pipelines
17.1. Russian manufacturers of tubular products
18 Profiles of holding companies designing trunk and non-trunk pipelines
19 Profiles of independent companies designing trunk and non-trunk pipelines
20 Foreign design companies in the Russian market.